Advanced exploration stage (mineral resource)
Detour-Fenelon Gold Trend ~45 km east of Detour Lake gold mine (Agnico Eagle Mines) and 30 km west of Fenelon Gold
Gold
100% Sunday Lake Gold
346,000 oz Au indicated and 387,000 oz Au inferred
Martiniere Overview
The Martiniere project is located approximately 110 km west of Matagami and 150 km north of Amos in Québec, Canada. It represents the second major gold asset within the company's extensive land package along the Sunday Lake Deformation Zone ("SLDZ"). Positioned 45 km east of the Detour Lake mine, operated by Agnico Eagle Mines, Martiniere remains a key exploration target. As of 27 March 2025, the company reported an updated mineral resource estimate (MRE) of 346,000 ounces of gold in the indicated category and 387,000 ounces in the inferred category.
Balmoral acquired the Martiniere project in November 2010, and from 2011 to 2017, it completed 133,852 meters of drilling across 519 diamond drill holes. These efforts culminated in an initial mineral resource estimate in March 2018. Their drilling expanded upon historical intercepts and further developed the Bug and Martiniere West gold deposits. Additionally, they identified multiple supplementary zones of mineralization, including VMS (volcanogenic massive sulphide) targets. The known mineralized footprint now encompasses an area of 2 km by 2 km.
Both gold trends at Martiniere remain open along strike, and mineralization remains largely untested below a vertical depth of 400 meters. Furthermore, numerous high-potential exploration targets suggest there may be additional gold zones and satellite deposits within the project area.
Projects
2025 Mineral Resource Estimate
2025 Mineral Resource Notes:
Notes to accompany the Detour-Fenelon Gold Trend Property 2025 Mineral Resource Statement and Mineral Resource Estimates for the Fenelon and Martiniere deposits:
- The effective date of the 2025 MREs is March 20, 2025.
- The 2025 MREs follow CIM Definition Standards (2014) and CIM MRMR Guidelines (2019).
- The qualified person (“QP”) for the 2025 MREs is Mr. Mauro Bassotti (P.Geo.) who is an independent mineral resource consultant.
- The criterion of reasonable prospects for economic extraction has been met by having constraining volumes applied to estimated blocks using GEOVIA Whittle pit optimizer (“Whittle”) softwarefor open pit mineral resources and using Deswik Stope Optimizer (“DSO”) software for underground mineral resources, and by the application of cut-off grades appropriate to the potential miningextraction scenario (i.e., open pit, underground long-hole, underground cut-and-fill). Constraining 3D Whittle open pit and DSO underground stope volumes have been generated based on a goldprice assumption of US$2,150 per troy ounce. A minimum mining width of 2.0 m was used for underground stope optimization.
- The potentially economic open pit shells and underground DSO shapes used for reporting the 2025 MREs have been generated by Mr. Simon Boudreau (P.Eng.), Senior Mining Engineer forInnovExplo Inc., a member of Norda Stelo Inc.
- For the Fenelon deposit, sixteen (16) mineralized domains and four (4) surrounding alteration envelopes were modelled in 3D to the true thickness of the mineralization. Supported bymeasurements, a density value of 2.80 g/cm3 was applied to blocks inside mineralized domains and 2.81 g/cm3 to blocks inside alteration envelopes. High-grade capping was applied to raw assaydata and established on a per-zone basis, ranging between 7 g/t Au and 100 g/t Au for the mineralized domains, and a fixed capping value of 10 g/t Au for the alteration envelopes. One-metre(1.0 m) sample assay composites were calculated within the mineralized domains and alteration envelopes using the grade of the adjacent material when assayed or a value of 0.001 when notassayed.
- For the Martiniere deposit, sixteen (16) mineralized domains and ten (10) surrounding alteration envelopes were modelled in 3D to the true thickness of the mineralization. Supported bymeasurements, the mean density value of the domain was applied to the blocks inside mineralized domains and alteration envelopes, with density values ranging from 2.80 to 3.09 g/cm3. Highgrade capping was applied to raw assay data and established on a per-zone basis, ranging between 15 g/t Au and 100 g/t Au for the mineralized domains, and a fixed capping value of 5 g/t Au forthe alteration envelopes. 1.0 m composites were calculated within the mineralized domains and alteration envelopes using the grade of the adjacent material when assayed or a value of 0.001when not assayed.
- The cut-off grades for the Fenelon deposit were calculated using a gold price of US$2,250/oz; a USD/CAD exchange rate of 1.35; a refining cost of $5.00/t; a processing cost of $30.00/t; amining cost of $5.75/t (bedrock) or $5.95/t (overburden) for the surface portion; a mining cost of $90.00/t for the underground portion; and a G&A cost of $10.00/t. A metallurgical recovery of95.0% and royalty of 4.0% were applied during the cut-off grade calculation.
- The cut-off grades for the Martiniere deposit were calculated using a gold price of US$2,250/oz; a USD/CAD exchange rate of 1.35; a refining cost of $5.00/t; a processing cost of $30.00/t; amining cost of $5.75/t (bedrock) or $5.95/t (overburden) for the surface portion; a mining cost of $125.00/t for the underground portion using the long-hole mining method (“LH”), a mining costof $135.00/t for the underground portion using the cut-and-fill mining method (“CF”); and a G&A cost of $10.00/t. A metallurgical recovery of 85.0% and royalty of 2.0% were applied to the cutoff grade calculation. The metallurgical recovery is based upon a metallurgical characterization study completed in December 2024 (SGS, 2024; Wallbridge news release dated December 19,2024).
- Tonnage estimates are reported to the nearest 1000 tonnes (000’s). Contained gold are reported to the nearest 1000 troy ounces (000’s).
- These mineral resources are not mineral reserves as they do not have demonstrated economic viability.
- The QP is not aware of any known environmental, permitting, legal, title-related, taxation, sociopolitical or marketing issues, or any other relevant issue, that could materially affect the potentialdevelopment of mineral resources other than those discussed in the 2025 MREs.
- Results are presented in situ. Ounce (troy) = metric tons x grade/31.10348. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations as per NI 43-101.

